Travelling Salesman Problem (TSP): Given a set of cities and distance between every pair of cities, the problem is to find the shortest possible route that visits every city exactly once and returns back to the starting point.
Note the difference between Hamiltonian Cycle and TSP. The Hamiltonian cycle problem is to find if there exist a tour that visits every city exactly once. Here we know that Hamiltonian Tour exists (because the graph is complete) and in fact many such tours exist, the problem is to find a minimum weight Hamiltonian Cycle. 
For example, consider the graph shown in the figure. A TSP tour in the graph is 1 -> 2 -> 4 -> 3 -> 1. The cost of the tour is 10 + 25 + 30 + 15 which is 80.
The problem is a famous NP hard problem. There is no polynomial time know solution for this problem.
 

TSP

 

Output of Given Graph: 
Minimum weight Hamiltonian Cycle : 10 + 25 + 30 + 15 = 80 
 

Approach: In this post, implementation of simple solution is discussed. 
 

  • Consider city 1 (let say 0th node) as the starting and ending point. Since route is cyclic, we can consider any point as starting point.
  • Start traversing from the source to its adjacent nodes in dfs manner.
  • Calculate cost of every traversal and keep track of minimum cost and keep on updating the value of minimum cost stored value.
  • Return the permutation with minimum cost.

Below is the implementation of the above approach: 
 

C++




// C++ implementation of the approach
#include <bits/stdc++.h>
using namespace std;
#define V 4
 
// Function to find the minimum weight Hamiltonian Cycle
void tsp(int graph[][V], vector<bool>& v, int currPos,
         int n, int count, int cost, int& ans)
{
 
    // If last node is reached and it has a link
    // to the starting node i.e the source then
    // keep the minimum value out of the total cost
    // of traversal and "ans"
    // Finally return to check for more possible values
    if (count == n && graph[currPos][0]) {
        ans = min(ans, cost + graph[currPos][0]);
        return;
    }
 
    // BACKTRACKING STEP
    // Loop to traverse the adjacency list
    // of currPos node and increasing the count
    // by 1 and cost by graph[currPos][i] value
    for (int i = 0; i < n; i++) {
        if (!v[i] && graph[currPos][i]) {
 
            // Mark as visited
            v[i] = true;
            tsp(graph, v, i, n, count + 1,
                cost + graph[currPos][i], ans);
 
            // Mark ith node as unvisited
            v[i] = false;
        }
    }
};
 
// Driver code
int main()
{
    // n is the number of nodes i.e. V
    int n = 4;
 
    int graph[][V] = {
        { 0, 10, 15, 20 },
        { 10, 0, 35, 25 },
        { 15, 35, 0, 30 },
        { 20, 25, 30, 0 }
    };
 
    // Boolean array to check if a node
    // has been visited or not
    vector<bool> v(n);
    for (int i = 0; i < n; i++)
        v[i] = false;
 
    // Mark 0th node as visited
    v[0] = true;
    int ans = INT_MAX;
 
    // Find the minimum weight Hamiltonian Cycle
    tsp(graph, v, 0, n, 1, 0, ans);
 
    // ans is the minimum weight Hamiltonian Cycle
    cout << ans;
 
    return 0;
}


Java




// Java implementation of the approach
class GFG
{
 
    // Function to find the minimum weight
    // Hamiltonian Cycle
    static int tsp(int[][] graph, boolean[] v,
                   int currPos, int n,
                   int count, int cost, int ans)
    {
 
        // If last node is reached and it has a link
        // to the starting node i.e the source then
        // keep the minimum value out of the total cost
        // of traversal and "ans"
        // Finally return to check for more possible values
        if (count == n && graph[currPos][0] > 0)
        {
            ans = Math.min(ans, cost + graph[currPos][0]);
            return ans;
        }
 
        // BACKTRACKING STEP
        // Loop to traverse the adjacency list
        // of currPos node and increasing the count
        // by 1 and cost by graph[currPos,i] value
        for (int i = 0; i < n; i++)
        {
            if (v[i] == false && graph[currPos][i] > 0)
            {
 
                // Mark as visited
                v[i] = true;
                ans = tsp(graph, v, i, n, count + 1,
                          cost + graph[currPos][i], ans);
 
                // Mark ith node as unvisited
                v[i] = false;
            }
        }
        return ans;
    }
 
    // Driver code
    public static void main(String[] args)
    {
 
        // n is the number of nodes i.e. V
        int n = 4;
 
        int[][] graph = {{0, 10, 15, 20},
                         {10, 0, 35, 25},
                         {15, 35, 0, 30},
                         {20, 25, 30, 0}};
 
        // Boolean array to check if a node
        // has been visited or not
        boolean[] v = new boolean[n];
 
        // Mark 0th node as visited
        v[0] = true;
        int ans = Integer.MAX_VALUE;
 
        // Find the minimum weight Hamiltonian Cycle
        ans = tsp(graph, v, 0, n, 1, 0, ans);
 
        // ans is the minimum weight Hamiltonian Cycle
        System.out.println(ans);
    }
}
 
// This code is contributed by Rajput-Ji


Python3




# Python3 implementation of the approach
V = 4
answer = []
 
# Function to find the minimum weight
# Hamiltonian Cycle
def tsp(graph, v, currPos, n, count, cost):
 
    # If last node is reached and it has
    # a link to the starting node i.e
    # the source then keep the minimum
    # value out of the total cost of
    # traversal and "ans"
    # Finally return to check for
    # more possible values
    if (count == n and graph[currPos][0]):
        answer.append(cost + graph[currPos][0])
        return
 
    # BACKTRACKING STEP
    # Loop to traverse the adjacency list
    # of currPos node and increasing the count
    # by 1 and cost by graph[currPos][i] value
    for i in range(n):
        if (v[i] == False and graph[currPos][i]):
             
            # Mark as visited
            v[i] = True
            tsp(graph, v, i, n, count + 1,
                cost + graph[currPos][i])
             
            # Mark ith node as unvisited
            v[i] = False
 
# Driver code
 
# n is the number of nodes i.e. V
if __name__ == '__main__':
    n = 4
    graph= [[ 0, 10, 15, 20 ],
            [ 10, 0, 35, 25 ],
            [ 15, 35, 0, 30 ],
            [ 20, 25, 30, 0 ]]
 
    # Boolean array to check if a node
    # has been visited or not
    v = [False for i in range(n)]
     
    # Mark 0th node as visited
    v[0] = True
 
    # Find the minimum weight Hamiltonian Cycle
    tsp(graph, v, 0, n, 1, 0)
 
    # ans is the minimum weight Hamiltonian Cycle
    print(min(answer))
 
# This code is contributed by mohit kumar


C#




// C# implementation of the approach
using System;
 
class GFG
{
 
// Function to find the minimum weight Hamiltonian Cycle
static int tsp(int [,]graph, bool []v, int currPos,
        int n, int count, int cost, int ans)
{
 
    // If last node is reached and it has a link
    // to the starting node i.e the source then
    // keep the minimum value out of the total cost
    // of traversal and "ans"
    // Finally return to check for more possible values
    if (count == n && graph[currPos,0] > 0)
    {
        ans = Math.Min(ans, cost + graph[currPos,0]);
        return ans;
    }
 
    // BACKTRACKING STEP
    // Loop to traverse the adjacency list
    // of currPos node and increasing the count
    // by 1 and cost by graph[currPos,i] value
    for (int i = 0; i < n; i++) {
        if (v[i] == false && graph[currPos,i] > 0)
        {
 
            // Mark as visited
            v[i] = true;
            ans = tsp(graph, v, i, n, count + 1,
                cost + graph[currPos,i], ans);
 
            // Mark ith node as unvisited
            v[i] = false;
        }
    }
    return ans;
}
 
// Driver code
static void Main()
{
    // n is the number of nodes i.e. V
    int n = 4;
 
    int [,]graph = {
        { 0, 10, 15, 20 },
        { 10, 0, 35, 25 },
        { 15, 35, 0, 30 },
        { 20, 25, 30, 0 }
    };
 
    // Boolean array to check if a node
    // has been visited or not
    bool[] v = new bool[n];
 
    // Mark 0th node as visited
    v[0] = true;
    int ans = int.MaxValue;
 
    // Find the minimum weight Hamiltonian Cycle
    ans = tsp(graph, v, 0, n, 1, 0, ans);
 
    // ans is the minimum weight Hamiltonian Cycle
    Console.Write(ans);
 
}
}
 
// This code is contributed by mits


Javascript




<script>
 
// Javascript implementation of the approach
var V = 4;
var ans = 1000000000;
// Boolean array to check if a node
// has been visited or not
var v = Array(n).fill(false);
// Mark 0th node as visited
v[0] = true;
 
// Function to find the minimum weight Hamiltonian Cycle
function tsp(graph, currPos, n, count, cost)
{
 
    // If last node is reached and it has a link
    // to the starting node i.e the source then
    // keep the minimum value out of the total cost
    // of traversal and "ans"
    // Finally return to check for more possible values
    if (count == n && graph[currPos][0]) {
        ans = Math.min(ans, cost + graph[currPos][0]);
        return;
    }
 
    // BACKTRACKING STEP
    // Loop to traverse the adjacency list
    // of currPos node and increasing the count
    // by 1 and cost by graph[currPos][i] value
    for (var i = 0; i < n; i++) {
        if (!v[i] && graph[currPos][i]) {
 
            // Mark as visited
            v[i] = true;
            tsp(graph, i, n, count + 1,
                cost + graph[currPos][i]);
 
            // Mark ith node as unvisited
            v[i] = false;
        }
    }
};
 
// Driver code
// n is the number of nodes i.e. V
var n = 4;
var graph = [
    [ 0, 10, 15, 20 ],
    [ 10, 0, 35, 25 ],
    [ 15, 35, 0, 30 ],
    [ 20, 25, 30, 0 ]
];
 
// Find the minimum weight Hamiltonian Cycle
tsp(graph, 0, n, 1, 0);
// ans is the minimum weight Hamiltonian Cycle
document.write( ans);
 
</script>


Output: 

80

 

Time Complexity: O(N!), As for the first node there are N possibilities and for the second node there are n – 1 possibilities.
For N nodes time complexity = N * (N – 1) * . . . 1 = O(N!)
Auxiliary Space: O(N)

Feeling lost in the world of random DSA topics, wasting time without progress? It’s time for a change! Join our DSA course, where we’ll guide you on an exciting journey to master DSA efficiently and on schedule.
Ready to dive in? Explore our Free Demo Content and join our DSA course, trusted by over 100,000 neveropen!

RELATED ARTICLES

Most Popular

Recent Comments